Your clients fall out of compliance
between visits.
EthicalHub keeps manufacturing plants audit-ready year-round — so the HACCP systems you implement actually stay working after you leave the site.
You built the HACCP programme.
Now you’re maintaining it for free.
Most QA consultants spend more time chasing manufacturing clients for evidence than doing actual consulting work. Every follow-up email, every reminder call, every unplanned remediation visit is unbilled time eating into your capacity to grow.
Everything your clients log on the floor —
reviewed by you, on your schedule.
The same screens consultants use in the app. Click a tab to see the dashboard, reports, and the plant-level tabs — PRPs, NCRs, suppliers, goods-in, and CCP — without a site visit or a follow-up email.
| Client | Location | Score | PRP | Open | Status |
|---|---|---|---|---|---|
| Southern Grain Milling | Geelong VIC | 0 | 12/18 | 2 | Overdue |
| FreshPack Foods | Laverton VIC | 0 | 15/18 | 0 | At risk |
| Coastal Condiments | Mornington VIC | 0 | 16/18 | 1 | At risk |
| Alpine Dairy Co. | Dandenong VIC | 0 | 17/18 | 0 | Healthy |
| Programme | Status | Last review | Next due |
|---|---|---|---|
| Approved Suppliers | Compliant | 12 May | 12 Aug |
| Receiving Controls | Compliant | 18 May | 18 Aug |
| Temperature Control | Due soon | 2 Apr | 2 Jun |
| Cleaning & Sanitation | Compliant | 20 May | 20 Aug |
| Allergen Management | Needs review | 8 Mar | Overdue |
| Traceability | Due soon | 1 Apr | 1 Jun |
| Category | Description | Priority | Assigned | Status |
|---|---|---|---|---|
| CCP failure | Metal detector failure — Line 2 | High | QA Manager | Open |
| Receiving | Missing goods-in log — Lot #8820 | Medium | Receiving | In progress |
| Sanitation | CIP cycle incomplete | Medium | Production | Resolved |
| Supplier | Reqs | Valid | Expiring | Missing | Next expiry |
|---|---|---|---|---|---|
| Valley Milk Co-op | 4 | 4 | 0 | 0 | 15 Aug 2026 |
| Organic Oils Pty Ltd | 3 | 1 | 0 | 1 | Lapsed 28 May |
| Pacific Packaging | 2 | 1 | 1 | 0 | 14 Jun 2026 |
| GrainGrowers AU | 3 | 2 | 1 | 0 | 30 Jun 2026 |
| Month | Signed by | Score |
|---|---|---|
| May 2026 | J. Smith · 1 Jun 2026 | 0 |
| April 2026 | J. Smith · 1 May 2026 | 77 |
| March 2026 | J. Smith · 1 Apr 2026 | 76 |
| Date | Supplier | Product | Temperature | Status |
|---|---|---|---|---|
| 30 May | Valley Milk | Raw cream | 3.2°C | Accepted |
| 30 May | GrainGrowers | Wheat flour | Ambient | Accepted |
| 29 May | Organic Oils | Sunflower oil | — | Rejected |
| 28 May | Pacific Pkg | Film wrap | Ambient | Accepted |
| CCP | Last reading | Limit | Status |
|---|---|---|---|
| Pasteurisation temp | 72.4°C · 30 May | ≥ 72.0°C | In spec |
| Metal detection | Fail · 30 May | Pass | NCR open |
| pH check — sauce | 4.1 · 29 May | ≤ 4.6 | In spec |
| Blast chiller | 2.8°C · 28 May | ≤ 5.0°C | In spec |
Every plant. One dashboard.
No follow-up calls.
Log in and immediately see which manufacturing clients need attention, which are audit-ready, and where compliance is slipping — without picking up the phone.
Complete the HACCP programme. Send one link.
Review from your desk.
The entire consultant–plant relationship — from onboarding to ongoing compliance review — runs through EthicalHub.
Less follow-up. More plants.
Better audit outcomes.
EthicalHub doesn’t change how you consult — it removes the admin overhead that caps how many manufacturing clients you can take on.
How your month changes.
Same clients. Same expertise. Half the admin.
- Email plants for supplier COAs before each visit
- Chase calibration schedules on a spreadsheet
- Discover expired COAs during a certifier audit
- Compile audit evidence manually from scattered records
- Return for remediation visits that weren’t in your schedule
- 3–5 hours of admin per plant per month just to stay current
- Plants log goods-in and PRPs — evidence appears in your dashboard
- COA expiry tracked automatically with alerts to you first
- Production Audit Readiness visible daily — you’re always ahead
- One-click HACCP audit pack generated in 60 seconds, any date
- NCRs tracked and closed before your next site visit
- Time recovered = capacity to onboard 2–3 more plants monthly
See how it fits your practice.
20 minutes. No obligation.
A walkthrough built for QA consultants supporting food manufacturers — see the full dashboard, ask questions, and decide if it changes how you manage client compliance.